FARMWAY ROAD CORRIDOR

Farmway Road Corridor Planning Study

Farmway Corridor Study - Project Map - LANDSCAPE Orientation - Large Size

Highway District No. 4 and the City of Caldwell have developed a corridor plan for future safety and capacity improvement to Farmway Road between SH 55 (Karcher Rd) and SH 19 (Simplot Blvd).  The agencies recognize this as a vital roadway for our growing community.

Components of the plan include the following:

  • Roadway section (i.e. number of lanes, pathways)
  • Major intersection type – traffic signals or roundabout
  • Access – future streets and property
  • Corridor cross sections

Farmway Road Corridor Plan 2023

HD4 and Caldwell are partnering to implement the first project on the corridor at the Ustick Rd and Farmway Rd intersection.  A multi-lane roundabout, sized for truck traffic, is planned for construction in 2025.